Allplan Bridge Day 2021 - The Power of Allplan Bridge IN PRACTICE

 

From BIM model to 2D drawings - Dali-Yuldo Bridge, Abhae-Hwawon Zone 2

LinkedIN_Cabletec

 

Mr. Kim from ALLPLAN partner company CableTec is presenting hybrid arch settlement concrete cable-stayed bridge from Soosung Engineering. BIM bridge model was created and successfully used for extraction of all required project deliverables. Project was finalized efficiently through the combination of a fully parametrized BIM model and the automation of workflow steps.

 

About the speaker:

Jaeheung Kim, Senior Manager, CableTec Co., Ltd.

Deputy General Manager Jaeheung Kim is a BIM consultant who conducts business related to smart construction at CableTec Co., Ltd. located in Seongnam-si, Gyeonggi-do. He majored in Steel Structural Engineering at Sangmyung University and earned a master's degree. He has performed domestic and foreign BIM cases, and modeled domestic roads, ports, dams, subways, airports, and complexes. He has worked in BIM for a variety of turnkey tasks. BIM was performed on tasks such as T301, T313, C821A in Singapore, Namlik Dam in Laos, Patrind Dam in Pakistan, and E-ring Road in Qatar.

 

View the webinar for free