Webinar: New features and enhancements of Allplan Bridge 2019-1

Authors: Diether Wagner/Blaž Mulavec - Company: ALLPLAN Infrastructure GmbH - Date: June, 2019

Allplan Bridge is a powerful solution for the parametric modelling of bridges. The software supports all design phases, from the concept to the final design. The parametric 4D model offers an unprecedented level of user friendliness and flexibility, saving significant design time.

 

 

Bridge_RecWebinar

  • Construction phases (definition, Gantt Diagram and animation)
  • New tools for cross-section definition (stiffeners, open boundaries,…)
  • LandXML file import
  • Further new features and enhancements (parametric lines, copy function, layers, view options,…)
  • Evaluation of cross section values and graphical presentation of the shear stress distribution

 

About the speakers:

Blaž Mulavec, MSc, Consultant – Bridge Engineering
Blaž works as a technical consultant with a focus on bridge engineering at the ALLPLAN Infrastructure GmbH. After completing his studies as MSc in civil engineering at the Graz Technical University in 2012, he worked on a self-employed basis on the evolution of innovative interdisciplinary technologies. During these years he gained practical experience in the area of UHPC in bridge construction, project management and construction supervision.

Diether Wagner, BSc, Senior Consultant – Bridge Engineering
Diether is a civil engineering graduate and has been part of ALLPLAN Infrastructure GmbH located in Graz since 2017. From his earlier work he brings 15 years of experience as a consultant, trainer and product manager in the field of bridge engineering and bridge software engineering. Today he advises and trains customers worldwide on the Allplan Bridge parametric bridge solution.

To view this recorded webinar, simply fill out the form and click the 'View Now' button.

 

Title: New features and enhancements of Allplan Bridge 2019.

Category: Allplan Bridge

Register now for free & view the webinar